STSX Case Studies: Real Results from Steel Fabricators

Steel fabricators across the country use STSX to improve inventory accuracy, streamline production, and eliminate costly shipping errors.

Steel Tracking Done Right: STSX in Action

Featured Case Study

new

Steel Fabricator–Production Tracking & Shipping Tickets

CHALLENGE

After a load was unloaded at an industrial job site, the customer reported several piece marks missing. The fabricator was preparing to fly someone to the site to find them.

SOLUTION

STSX loading scans and the site crew’s mobile receiving scans gave a time-stamped record of every piece. The data showed each “missing” piece mark had been loaded and received.

Read the full job site delivery verification case study

RESULTS

  • Delivery proven  with time-stamped scan data
  • Emergency trip to the job site avoided
  • Issue reolved in about 3-4 hours

“I guess this stuff really works.”

– Site superintendent

new

Steel Fabricator–Production Tracking & Shipping Tickets

CHALLENGE
Production was tracked on paper, with no quick way to see where a piece was, who had worked on it, or whether a load was complete.

SOLUTION
Barcode scans at each process station record who inspected and who did the work. Shipping tickets are built from scans.

RESULTS

  • Manual production sheets eliminated
  • Research cut from [X hours] to [X minutes] per issue
  • Loading mistakes virtually eliminated
  • Fewer costly hot-shot deliveries

 

More STSX Case Studies

Steel Fabricator–Inventory & Shipping Visibility

Material was difficult to track across the yard and shop floor, and teams relied on paperwork to locate steel and confirm loads.

  • Improved inventory accuracy
  • Reduced time locating material
  • More reliable load verification

Read the inventory visibility case study

Structural Steel Operation–Production Visibility

Production status was difficult to track across multiple work areas.

  • Clear visibility into production status
  • Reduced reliance on manual updates
  • Faster decision-making on the shop floor

Read the production visibility case study

Steel Fabricator–Shipping Accuracy

Shipping errors occurred due to incomplete or unclear load verification.

  • Improved shipping accuracy
  • Reduced missing or incorrect items
  • Fewer callbacks and corrections

Read the shipping accuracy case study

Fabrication Shop–Inventory Control

Inventory tracking relied on spreadsheets and manual processes.

  • Continuous tracking from receiving to shipment
  • Reduced tracking gaps between departments

Read the inventory control case study 

Steel Operation–End-to-End Traceability

Material tracking was inconsistent across receiving, fabrication, and shipping.

  • More accurate inventory records
  • Reduced time spent searching for
    material

Read the end-to-end traceability case study

Steel Fabricator–Workflow Efficiency

Manual tracking slowed operations and created delays across the workflow.

  • Increased efficiency across fabrication
  • Reduced delays and bottlenecks
  • Faster project timelines

Read the workflow efficiency case study

Real Outcomes from Real Shops

P2 Programs brings more than 100 years of combined experience in the steel fabrication industry. We’ve been in your shops, seen your workflows, and built a system around how fabrication actually runs.

P2 Programs case studies real outcomes

Want Results Like this in Your Operation?

See how STSX helps steel teams improve inventory accuracy, track production in real time, and verify shipments before they leave.

Contact P2Requst an Estimate